Physical Address
Indirizzo: Via Mario Greco 60, Buttigliera Alta, 10090, Torino, Italy
Physical Address
Indirizzo: Via Mario Greco 60, Buttigliera Alta, 10090, Torino, Italy

Photo: Ministry of Reconstruction of Ukraine
A unique construction element will be used to rebuild the bridge over the River Desna near the northern Ukrainian city of Chernihiv, which was destroyed by Russian occupation forces in March 2022.
Source: Ministry for Communities, Territories and Infrastructure Development of Ukraine (Ministry of Reconstruction) on Facebook
Details: The structure will have the longest continuous monolithic span made of post-tensioned concrete.
Advertisement:
“In practice, this means that the technologies used during construction take into account modern load standards and make the new bridge ultra-crack-resistant,” the ministry explained.
At 628 metres long, this bridge will be the longest bridge over Desna.
It will have four traffic lanes, traffic interchanges, an underground pedestrian crossing, sidewalk and pedestrian zones, bicycle paths, and a path for people with limited mobility.




Background:
Support UP or become our patron!